CASE STUDIES
Our case studies showcase a proven track record of excellence in addressing unique challenges and providing innovative solutions within the dynamic field of power generation.
DRAINAGE PUMP STATION
No.2 Road North Drainage Pump station
upgrade in City of Richmond
In collaboration with the City of Richmond, Simson Maxwell delivered specially designed generators to aid in completing the No. 2 Road North Drainage Pump Station Upgrade.
The project, initiated in 2016 and finalized in 2018, is a testament to our commitment to excellence in utility construction. While the project received accolades..
WASTE TREATEMENT
Viking Ozone - The Evolution of
Medical Waste Treatment
Medical waste, also known as biohazardous waste treatment, has evolved over the centuries. The most significant changes have occurred post-1900. These significant changes are driven by the longer life expectancy and lower mortality rate over the last century.
As healthcare evolved to take care of more people on earth, so has the magnitude of medical waste material that needed to be disposed of.
MINING
Simson-Maxwell assists Baffinland expand its mining
operations by deploying generators for power
Amidst a strategic expansion initiative to boost ore mining capacity, Simson
Maxwell was entrusted with enhancing primary and backup power reserves at two key operational sites for the Baffinland Mining Corporation.
Central to this endeavour were five major diesel generators commissioned…
PRIME POWER UTILITY
Simson-Maxwell Tackles Major Project
Supporting Iqaluit, Nunavut
Simson-Maxwell was engaged by the Qulliq Energy Corporation (QEC) with a
substantial project to improve the energy infrastructure in Iqaluit, located in Nunavut, Canada.
As part of this endeavor, Simson-Maxwell replaced the current power unit with their custom-designed Wabtec (Previously General Electric) powered diesel generators.